-
Fabric Details
100% recycled polyester microfiber H2No® Performance Standard shell with a proprietary waterproof/breathable barrier and a DWR (durable water repellent) finish
-
Construction Details
Single-seam construction for durability and a gusseted crotch for freedom of movement and comfort
-
Durable Comfort
Self-fabric belt loops; fully elastic belt; interior center-back hanger loop for easy drying
-
Expandable Waistband
Expandable waistband for easy on/off and a clean, tailored fit at the waist
-
Articulation and Scuff Guards
Articulated legs; heavy-duty scuff guards at ankles
-
Anatomical Booties
Anatomical booties have lower volume and a sock-like fit for all-day wading comfort
-
Country of Origin
Made in Vietnam.
-
Weight
1,012 g (35.7 oz)
- H2No® Performance Standard shell: 4-layer, 5.1-oz 100% recycled polyester microfiber high-density taffeta face bonded to a 100% recycled polyester backer, with a waterproof/breathable barrier and a DWR (durable water repellent) finish
Swiftcurrent Wader Pant Sizing Information
| Size | Waist | Inseam | Bootie |
|---|---|---|---|
| SRM Small – Reg Length | 29″-30″ | 32 | 9-11 |
| MXM Medium – Extra Short Length | 31″-33″ | 28 | 9-11 |
| MSM Medium – Short Length | 31″-33″ | 30 | 9-11 |
| MRM Medium – Reg Length | 31″-33″ | 32 | 9-11 |
| MRL Medium – Reg Length | 31″-33″ | 32 | 12-14 |
| MLM Medium – Long Length | 31″-33″ | 34 | 9-11 |
| LSM Large – Short Length | 34″-36″ | 30 | 9-11 |
| LRM Large – Reg Length | 34″-36″ | 32 | 9-11 |
| LRL Large – Reg Length | 34″-36″ | 32 | 12-14 |
| LLL Large – Long Length | 34″-36″ | 34 | 12-14 |
| XRM Extra Large – Reg Length | 38″-40″ | 32 | 9-11 |
| XLL Extra Large – Long Length | 38″-40″ | 34 | 12-14 |
| 2RM Double Extra Large – Reg Length | 42″-44″ | 32 | 9-11 |















Reviews
There are no reviews yet.